Friday, April 2, 2010

Finishing the Septic Project


It's done. The trench is filled in, and Larry has installed a new outdoor shower. He has layed ten bags of riverbed peastone beneath the shower, and is out in the garage right now making a platform to stand on over the stones out of wood we have laying around that can't be burned.

As he has found out from this project, there are always surprises lurking. When he dug up the old shower concrete platform, he found the copper waterpipe that brings water to the house. He also discovered that it had a kink or a bend in it. This has been bothering him all along and wondered if our water pressure is affected by this kink. He wrestled with whether or not to cut out the kink and sauter a new piece in. His list of projects is long enough for the short time we have left: install a secure pvc pipe to hold the new umbrella on the dock to shade the glider, install marine cleats on the dock for his brother to tie his boat up to instead of to the railings. replace dock light bulbs, install curtain rods for me on the brick walls, etc. But, he decided he just couldn't live with the kink, so he fixed it.

Not only did he fix the kink, he dug a trench away from the shower and installed a pvc drainpipe with screens and landscape cloth on the ends to keep out silt. He did a great job. It'll work wonderfully until sometime next year when we can knock out that whole wall and expand our kitchen.

1 comment:

  1. expanded kitchen!!!!! be still my pounding heart!
    are you already planning, or at least trolling Home Depot? I would give my eyeteeth and left kidney for Gummy's kitchen sink.

    ReplyDelete